Piping Installation & Fabrication
Piping Installation
1.
Piping
installation or erection refers to the laying of the piping system and its
related accessories to make for fluid transfer.
2.
Popper
piping Installation following code and standard are the key to safety and good
operation.
3.
The next
step to piping fabrication where pipe spool made in the fabrication shop by
cutting of the pipe as per accurate length and requirements.
Documents for Reference
·
Contract
Documents
·
Standards Specification
for Fabrication and erection of piping
·
Standards Specification
for non-destructive examination requirements of piping.
·
Piping
Materials specification.
·
Specification
for Positive Materials Identification at site
·
Construction
Drawing Latest Revision
·
Materials
Specification
·
ASME code
Pressure Piping -ASME-B31.3
·
Materials Specification:
Welding Rods, Electrode & Filler Metal
Input required
for Piping Installation
The main Input during refer during Piping Installation
1.
Structure Drawing
2. P & ID
3. Piping GA Drawing
4. Piping Isometric Drawing
5.
Piping Support Drawing
P & ID is considered
to be the heart of piping, they include, Pipe Line Number, Size of pipe,
Materials and Insulation. Process Condition and Physical Data. Operation
Condition, Stream Flow details, Equipment’s Number etc.
Piping isometric drawings with exact dimensions represents, line number,
piping fittings, valves, flange, specials components and including a list of
all fittings in the drawing etc.
Piping GA includes the main equipment of the plant, main piping items,
fittings and valve Nozzle Orientation etc.
Procedure of Piping Installation
Piping Installation normally start after civil
supports are Erected and major type of equipment are placed on
construction site. Installation piping
can we group into the following’s parts.
- 1.
Pipe work
Erection.
- 2.
Installing
Piping Flange & Support.
- 3.
Insulation
and Painting.
- 4.
Marking
and Identification.
- 5.
Installation
Expansion joint.
- 6.
Vent and
Drains.
- 7.
Underground
Pipe Installation.
WPS/PQR & Welder
Qualification
·
Proposed
Welding Procedure Specification (PWPS) shall be submitted before star the work.
·
Client
Inspector Will review and check and approve the Welding Procedure Submitted And
shall release the Procedure for Qualification tests.
·
Procedure
Qualification Record (PQR) & respective welding Procedure Specification (WPS)
shall be prepared on the basis of test result and submitted to client for
approval and then Production welding joint at site.
Welder Qualification.
·
Welder
shall be qualified in accordance with the ASME Sec-IX code.
·
Only those
welders who have been approved by the client inspector shall be deployed for
welding.
·
The
welders need to always have welder identification card.
·
If welder
found to perform a wrong position and type of welding then client disqualified
that welder.
Electrode & Filler
·
All electrode
must be sealed containers and stored, after removing from seal containers shall
be kept in oven holding at suitable temp.
·
The
Electrode and filler wires used shall be free from rust, oil, grease which
affect the quality of welding.
·
Welding
Consumable shall be controlled as per approval procedure.
PIPING Fabrication:
- 1.
Piping Materials
- 2.
Dimensional Tolerance
- 3.
Pipe Joints
- 4.
But Welded and Socket
welded piping.
- 5.
Screw Piping
- 6.
Flange connection
- 7.
Branch Connection
- 8.
Miter Bend and
Fabricated Reducer
- 9.
Cutting And Trimming of
Standard Fittings & Pipe.
- 10. Galvanized Piping
- 11. Shop Fabrication.
1. Piping Materials:
·
All incoming materials
shall be inspected as per approved ITP
·
Pipe, Pipe Fittings,
Flange, Valve, Gasket, Stud Bolts etc all are check strictly as per PMS.
·
Materials Traceability
shall be maintained for A.S, S.S, NACE, LTCS & transferring heat number.
·
Must be Colour Coadding
for all piping materials as per procedure.
2.Dimensional
Tolerance:
·
Dimension tolerance for
piping fabrication shall be as per client standard. In order to adjust the
variation in Dimension shown in AFC drawings & actual site, “Field Weld”
shall be provided during fabrication.
·
Whenever error occur in
drawings and bill of materials it shall be supervisor responsibility to notify
the client.
3.Pipe Joints
·
Joining of line 2” and
above in process and utility piping shall be pererered by butt weld.
·
Joining of line 1-1/2”
and below shall be by socket welding/ Butt welding/ Threaded joints as
specified in piping materials specification.
4. But Welded and
Socket welded piping.
·
End preparation,
Alignments and Fit-up of piece to be welded, Welding, Pre-heating and heat
treatment (PWHT)shall be followed as describe in the welding specification
chart.
·
NDT specification as
along with tender documents
5.Screwed Piping
·
Galvanized Piping shall
have thread as per ANSI B2.1.
·
Pipe thread shall be
clean cut, without any burrs.
·
Threading of Pipe shall
be done after bending or Heat treatment Operation.
·
During assembly of
threaded joints, all threaded of pipe or fittings shall be cleaned.
·
The male threads shall
be coated with thread sealant and the joint tightened sufficiently for leak
proof joint.
6. Flange connection.
·
All Flange Facing shall
be true and perpendicular to the Axis of the pipe to which they are attached.
·
Clean pipe flange, without forcing to bear uniform bolt
tension and gasket compression & flange hole as per drawing.
·
Line item like orifice flanges, Spectacle blind, Strainer
etc. shall be installed Following proper orientation.
·
A flange connection for the equipment’s shall be check for
misassignment excessive gaps etc.
·
Extra care is to be exercised for flange connection to pump,
turbines, cold boxes, air cooler.
·
Whenever a sceptical
blind is to provided, Drilling and taping Jack screws in the flange shall be
done before welding.
7. Branch connection: -
·
Branch connection with
or without reinforcing pads shall be as indicates in the PMS.
·
For End preparation, Alignments,
spacing, fit-up and welding and any of branch connection client guideline to be
referred.
8. Cutting and Trimming
of Standard fittings & pipe.
·
Component like pipe,
elbow, Couplings, half couplings etc. shall be cut / trimmed edge preparation
whenever required to meet fabrication and erection requirements as per drawings
or as per client standard.
9. Shop Fabrication/
Prefabrication
·
The purpose of shop
fabrication or pre-fabrication is to minimize work during the Erection.
·
Piping spool after
fabrication stacked with proper identification marker on each spool.
· During this period all flange raise face and threaded nee to be extra care and to avoid physical damage also.