Posts

Showing posts from May, 2023

Piping Engineer / Supervisor Interview Important Short Guide.

Image
INTRODUCTION G ood afternoon, sir Have nice Day first of all, thanks for Giving me opportunity to Introduce myself. My name ……………….. I have done B.tech Mechanical Engineer I have more than 8 years’ experience in Oil and Gas Petrochemical Refinery. last company I work in …………………………….in SRU unit, In SRU unit total 07 internal unit 1. Amine Regeneration unit (Saturated / Unsaturated), 3. Sulphur Recovery U-1 &2.    5. Sour Water Stripper (Phenolic / Non phenolic) 7. Caustic Scrubber Unit. ABD- Amine Blow Down   OWS- Oily Water Sever   WF- Fire Water    CRW- Contaminated Rain Water V – Vent   SS- Strome Water     CDH- Closed Drain Header    WCS- Cooling Water Return   P- Process FL- Flare   CL- Medium Pressure Condensate   BCR- Bearing Cooling Water Return   I have done Piping Installation work Like Piping Fabrication, Piping Erection, piping Support Installation, Pipe Hydro or Pneumatic testing, Piping Mechanical Clearance and Piping mechanical A Category