Explains in details For Pre- Commissioning work basic details in oil & gas

  Pre- commissioning activity   1. Hydrotest of Pipelines   2. Leakage Test of Pipelines   3. Flushing & Cleaning of Pipelines   4. System dry-out   5. Inerting   6. Systematic Conformity Check of Equipment   7. Static, De-energized Test of Equipment Commissioning:   1. Preliminary Check   2. Functional Check   3. Operational Test   4. Pre-Startup activities Pre-commissioning and commissioning activities are crucial in the oil and gas industry to ensure that all equipment and systems are installed, tested, and ready for safe and efficient operation. Pre-commissioning activities are carried out before commissioning and involve a series of tests and checks to verify the integrity and functionality of various components, while commissioning activities focus on ensuring that the entire system operates as intended. Let's delve into the details of each of the mentioned pre-commissioning and commissioning activities.   Pre-Commissioning Activities: Hydr

Basic Important points for Hydro-Test engineer

  Basic And Important points for Hydro-Test engineer          I.           Making a detail testing plans, Method Statements and procedures with industry standards, project specifications, and safety regulations.      II.           Ensured all testing activities were conducted safely, with proper precautions and Required PPESs Used.     III.           Conducted hydrostatic tests, monitoring pressure, temperature, and duration to verify structural integrity and find leak.    IV.           Maintained records of test procedures, results for certification purposes.      V.           If any leaks and defects during testing, identifying root causes and recommend corrective actions.    VI.           Ensured quality standards as per API and ASME codes.   VII.           Prepared test reports, results for project management and authorities. VIII.           Provided training and guidance to personnel involved in testing activities,     IX.           Conducted risk assessments to identify potent

Piping Engineer / Supervisor Interview Important Short Guide.

Image
INTRODUCTION G ood afternoon, sir Have nice Day first of all, thanks for Giving me opportunity to Introduce myself. My name ……………….. I have done B.tech Mechanical Engineer I have more than 8 years’ experience in Oil and Gas Petrochemical Refinery. last company I work in …………………………….in SRU unit, In SRU unit total 07 internal unit 1. Amine Regeneration unit (Saturated / Unsaturated), 3. Sulphur Recovery U-1 &2.    5. Sour Water Stripper (Phenolic / Non phenolic) 7. Caustic Scrubber Unit. ABD- Amine Blow Down   OWS- Oily Water Sever   WF- Fire Water    CRW- Contaminated Rain Water V – Vent   SS- Strome Water     CDH- Closed Drain Header    WCS- Cooling Water Return   P- Process FL- Flare   CL- Medium Pressure Condensate   BCR- Bearing Cooling Water Return   I have done Piping Installation work Like Piping Fabrication, Piping Erection, piping Support Installation, Pipe Hydro or Pneumatic testing, Piping Mechanical Clearance and Piping mechanical A Category