Piping System Installation

Image
  Introduction Welcome to Piping Knowledge! In this video, we will explore different types of pipe welds . Pipe welding is the process of joining pipes, fittings, flanges, or valves to create a functional piping system. This is a fundamental aspect of pipe fabrication . Before diving into the types of welds, let’s understand the piping system installation process, which typically follows fabrication. Piping System Installation Installation Methods: Shop Fabricated and Field Installed: Piping components are welded into spools in a controlled shop environment. Spools are transported to the site for assembly. Field Fabricated and Installed: Pipes are fabricated and installed directly at the job site. Common Practices: Butt-welded piping is typically used for NPS 2” and above. Shop fabrication minimizes field welding, which is costlier and more time-consuming. Prefabricated piping systems ca...

Explains in details For Pre- Commissioning work basic details in oil & gas

  Pre- commissioning activity   1. Hydrotest of Pipelines   2. Leakage Test of Pipelines   3. Flushing & Cleaning of Pipelines   4. System dry-out   5. Inerting   6. Systematic Conformity Check of Equipment   7. Static, De-energized Test of Equipment Commissioning:   1. Preliminary Check   2. Functional Check   3. Operational Test   4. Pre-Startup activities Pre-commissioning and commissioning activities are crucial in the oil and gas industry to ensure that all equipment and systems are installed, tested, and ready for safe and efficient operation. Pre-commissioning activities are carried out before commissioning and involve a series of tests and checks to verify the integrity and functionality of various components, while commissioning activities focus on ensuring that the entire system operates as intended. Let's delve into the details of each of the mentioned pre-commissioning and commissioning...

Basic Important points for Hydro-Test engineer

  Basic And Important points for Hydro-Test engineer          I.           Making a detail testing plans, Method Statements and procedures with industry standards, project specifications, and safety regulations.      II.           Ensured all testing activities were conducted safely, with proper precautions and Required PPESs Used.     III.           Conducted hydrostatic tests, monitoring pressure, temperature, and duration to verify structural integrity and find leak.    IV.           Maintained records of test procedures, results for certification purposes.      V.           If any leaks and defects during testing, identifying root causes and recommend corre...